About the area
The Goulburn basin covers a large area in northern Victoria. It extends from the Great Dividing Range near Woods Point in the south-east to the Murray River near Echuca in the north-west.
Climate in the basin varies, with the high country experiencing cool winters and persistent snow and regions in the north-west generally experiencing a lower annual rainfall.
Higher stream flows within the basin occur during July-September; lower streamflow occurs during warmer months (January-March).
Agriculture in the basin is diverse, ranging from hardwood timber production in the south-east to dairying and fruit production in the north. Sheep and cropping are important in dryland and irrigated areas.
More information on water management and accounting is detailed in Water explained.
2023-24 overview
Available water
Catchment inflow was lower than the previous year.
Licensed diversion restrictions
There was a similar level of restrictions on licensed diversions to the previous year.
Seasonal determinations
While high-reliability entitlements received 100% (the same as last year), less water was available for low-reliability water shares.
Water use
About the same volume of water was diverted for consumptive purposes as the previous year.
When compared to the previous year, in 2023-24:
- less rainfall was received, catchment inflow was lower and storage levels peaked and declined at lower levels
- there was a similar level of restrictions on licensed diversions from streams
- high-reliability entitlements reached 100% allocation about two months earlier
- low-reliability entitlements received 77% allocation, less than the previous year
- about the same volume of water was diverted from the basin for consumptive purposes
- less water was diverted for environmental purposes.
Climate
Rainfall
In 2023-24, less rainfall was received in the Goulburn basin than the previous year. Rainfall was:
- below average over the Yea and Acheron catchments in the south-west, encompassing Kinglake National Park, Marysville and Taggerty
- average across most of the basin
- above average in the north over Kyabram and in an area near Seymour.
Figure 1 displays the rainfall received in 2023-24 compared to the long-term average (1975-2024).
Figure 1: Rainfall deciles, Goulburn basin
Sourced from the Australian Bureau of Meteorology
River basin water balance
This section describes the known and estimated inflows, outflows and change of storage volumes in the basin.
More detail on major on-stream storages, catchment inflows, diversions and small catchment dams can be found in the sections below the water balance.
In 2023-24, of the total inflows, 73% flowed out at the outlets of the Goulburn basin:
- as outflow to the Murray River
- as outflow to the Murray River via Broken Creek.
Water balance table
The table below shows the total volumes of water available and supplied from water resources in the Goulburn basin in 2023-24.
Table 1: Water balance, Goulburn basin
Major on-stream storages
Major — greater than 1,000 ML — on-stream storages in the Goulburn basin are included in the water balance. Volumes in off-stream storages are presented for additional information about the resource condition.
Storage levels
Storage levels in the Goulburn basin were 89% on 30 June 2024.
Lower than the previous year
On 30 June 2023, storage levels were 98% full.
Table 2: Storage levels, Goulburn basin
Inflows
Catchment inflow
Catchment inflow represents the volume of water flowing into the waterways of a basin. It is calculated as the sum of the total outflows and change in storage minus the known inflows. The long-term average inflow presented has been updated from the previous Victorian Water Accounts, as detailed in Water Explained. The updated long-term average inflow has been applied to this year and the previous year’s volume in this report.
Below average inflows of 2,594,669 ML were received (93% of the long-term average of 2,788,200 ML), less than the previous year (178% of the long-term average).
Below average catchment inflow received
Catchment inflow was 93% of the long-term average annual volume of 2,788,200 ML.
Less water received than the previous year
Catchment inflow was lower than the previous year (178% of the long-term average).
Wastewater treatment plants
Water treated at wastewater treatment plants can be used to supplement water available in the basin. Water discharged to waterways from treatment plants is included as an inflow to the water balance.
Information on treatment plants is reported in the water supply local reports for the water corporation responsible for managing the plant.
In this basin, wastewater treatment plants are managed by Goulburn Valley Water.
Outflows
Diversions
In 2023-24, 788,264 ML of water was diverted for consumptive uses - town, domestic and stock, irrigation and commercial supply - and the environment. This was about the same as the 788,831 ML diverted in the previous year. Although the total volume of water diverted was similar to the previous year, there was a decrease of 11,934 ML in the estimation of small catchment dam use volume and a slight increase in the volume diverted for irrigation.
Small catchment dams
Water harvested, used and lost by small catchment dams (farm dams) is included in the water balance.
Table 3: Small catchment dams, Goulburn basin
Entitlements and compliance
Entitlements provide the basis for how water is shared in the basin.
Melbourne Water holds a bulk entitlement to divert surface water from Silver and Wallaby Creeks. This entitlement is one of four which contribute to the Greater Yarra system - Thomson River Pool, which primarily supplies Melbourne and supports regional urban water corporations, including Barwon Water, Greater Western Water, South Gippsland Water and Westernport Water.
Entitlements (except some waterworks districts entitlements) to water in the regulated system of the Goulburn basin provide for the right to carry over unused allocation to the next season. In the Goulburn basin, holders of these entitlements can carry over unused water up to 100% of their entitlement volume. Water held above entitlement volume is subject to a risk of spill: 560,191 ML was written off due to spill events in 2023-24.
The Victorian Environmental Water Holder (VEWH) holds Bulk Entitlement (Goulburn System - Snowy Environmental Reserve) Order 2004 and some water shares in trust for the Snowy River. Allocation to the entitlement is traded from the VEWH’s account to the Snowy Scheme so it can be subsequently released from the Snowy Scheme to support the health of the Snowy and Murray rivers. Information about this entitlement can be found in Managed environmental water.
Consumptive diversions under bulk entitlements are assessed against the Murray-Darling Basin annual cap target for the Goulburn-Broken-Loddon valley. Details of this assessment are published annually in the MDBA’s cap register and annual water take report.
Since 2019-20, the consumptive diversions are also assessed against the annual permitted takes under the Murray-Darling Basin Plan Sustainable Diversion Limit (SDL) compliance reporting, which are annually published in the MDBA’s SDL accounts register of take and the Inspector-General of Water Compliance’s SDL compliance statement.
Entitlement volumes
Rights to water in the Goulburn basin are shown in Table 4.
Entitlement volumes represent a maximum volume of water that can be taken in a one-year period. The volume available in a particular year is dependent on the rules for allocating water set out in the entitlement and the seasonal conditions in that year, which can vary. The rules for allocating water under an entitlement differ between entitlements and systems. This affects the ability and likelihood of water being taken in a particular year.
Table 4: Annual entitlement volumes at 30 June, Goulburn basin
Available water and take under entitlements
Total water available under entitlements represents the volume of water that was available to be taken by entitlement holders in 2023-24. The volume includes carryover from the previous year, seasonal allocations and net trade into the basin.
Water available under entitlements
While high-reliability entitlements received 100% (the same as last year), less water was available for low-reliability water shares.
Water taken under entitlements
There was 1,212,234 ML taken under entitlements in 2023-24, more than the previous year (1,017,489 ML).
Seasonal allocations
- High-reliability entitlement allocations opened at 100% (earlier than the previous year).
- Low-reliability entitlements opened at 19% in October 2023 and reached a final allocation of 77% in February 2024, lower than the previous year when they reached 100%.
Restrictions on licensed diversions from streams
- Diversions were banned from Faithfulls Creek from March to May 2024 and from Sunday Creek from November 2023 to June 2024.
- All other streams were unrestricted for the year.
- During the previous year, the same streams had bans on licensed diversions.
Available water and take table
This table shows the volume of available water and the volume taken under entitlements in 2023-24.
More information on available water and take has been detailed in How we account for surface water.
In 2023-24, more water was taken under entitlements than the previous year.
Table 5: Available water and take under entitlements, Goulburn basin
Compliance
Compliance against water entitlements is reported for this basin in 3 areas:
- entitlement issued: that the volume of entitlements issued in a basin does not exceed formal caps, and has not increased without appropriate approvals
- water taken: that the volume of water taken during the year does not exceed the volume considered to be available for consumptive and/or in-stream use during that year
- bulk entitlement provisions: that holders of entitlements do not breach any provisions that are documented in their bulk entitlement orders.
Total entitlement volume
There was an allowed increase in the total entitlement volume from the previous year (an overall increase of 2,548 ML). See notes below.
Total volume diverted
The total volume diverted under entitlements (1,212,234 ML) was within the volume available for the year (2,262,912 ML).
Individual bulk entitlements
No individual bulk entitlement holder took more than the annual volume made available to them.
Exceptions to compliance
Individual bulk entitlement holders complied with all provisions in their entitlements. However, some compliance difficulties were reported. See notes below.
Note to increase in entitlement volume:
- Water share volume increased by 3,750 ML (high-reliability) and 1,115 ML (low-reliability); issued for Goulburn-Murray Water Water Efficiency Project. Water share volume also decreased by 194 ML (high-reliability) following surrender/cancellation of water shares
- A new Mitigation Water environmental entitlement was issued to the Victorian Environmental Water Holder (1,506 ML high- and 749 ML low-reliability entitlement). This is from water savings from the Goulburn-Murray Water Connections Project. These entitlements replaced the Environmental Entitlement (Goulburn System – NVIRP Stage 1) 2012 which was repealed on 20 June 2024.
- Take and use licence (TUL) entitlement volumes and small catchment dam (SCD) entitlement volumes changed following conversions from one type to the other (e.g. 107 ML converted from SCD licence entitlement to TUL and 43 ML converted from TUL to a SCD). Multiple TULs were also cancelled, surrendered or revoked. This resulted in a net increase of 28 ML in TULs and a net decrease in SCDs of 64 ML.
- More information on the Goulburn-Murray Water Connections Project and Goulburn-Murray Water Water Efficiency Project can be found in the Statewide Surface Water Entitlements and compliance section.
Notes to exceptions to compliance:
- Goulburn-Murray Water reported that losses in Central Goulburn were 2 GL higher than the loss provisions in Schedule 1. This was within the annual headroom allowance. The combined Goulburn component of the Goulburn-Murray Irrigation District loss was within loss provisions.
- The Victorian Environmental Water Holder reported the operating arrangement for the Goulburn System Mitigation Water Environmental Entitlement Order 2023 was incomplete at the time of the deadline in the environmental entitlement order. The operating arrangement was reviewed and implemented in 2023-24 during delivery under the entitlement. The associated documentation was updated in April 2025.
Water for the environment
Environmental watering sites
Environmental watering sites in the Goulburn basin that depend on water for the environment include:
- wetlands of national significance, significant areas of intact riparian and floodplains vegetation and endangered flora and fauna species, including trout cod and Murray cod
- the lower Goulburn River floodplain (downstream of Goulburn Weir), which is listed as a wetland of national significance and is a native fish habitat and floodplain national park
- Reedy Swamp, a regionally significant wetland that is part of the Lower Goulburn National Park, which contains drought refuge and significant habitat for colonial nesting birds
- water from the Goulburn basin that also flows into the Murray, Campaspe and Loddon basins, helping to maintain internationally significant environmental assets (such as Gunbower Forest and the Hattah Lakes in the Murray basin).
Environmental water reserve
In 2023-24, water sourced from the Goulburn basin for the environment comprised:
- the Environmental Entitlement (Goulburn System - Living Murray) 2007, which includes 39,625 ML of high-reliability and 156,980 ML of low-reliability entitlements held by the VEWH
- the Goulburn River Environmental Entitlement 2010, which includes 26,426 ML of high-reliability and 5,792 ML of low-reliability entitlements held by the VEWH
- the Environmental Entitlement (Goulburn System - NVIRP Stage 1) 2012, which includes allocated mitigation water for the purposes of watering specific environmental sites that have been identified through the Goulburn-Murray Water Connections Project environmental approvals processes. This entitlement was repealed on 20 June 2024 and replaced by the Goulburn System – Mitigation Water Environmental Entitlement 2023 below
- Goulburn System – Mitigation Water Environmental Entitlement 2023, which includes 1,506 ML of high-reliability and 749 ML of low-reliability entitlement, replacing the repealed Environmental Entitlement (Goulburn System - NVIRP Stage 1) 2012
- the Bulk Entitlement (Goulburn System - Snowy Environment Reserve) Order 2005, which includes 30,252 ML of high-reliability and 8,156 ML of low-reliability entitlements
- up to 7,490 ML of water each year, as part of the Bulk Entitlement (Loddon River - Environmental Water Reserve) Order 2005
- 334,605 ML of high-reliability water shares and 61,032 ML of low-reliability water shares held for the environment
- water set aside for the environment through the operation of passing flow conditions:
- on consumptive bulk entitlements (regulated and unregulated systems) held by Goulburn Valley Water and Goulburn-Murray Water
- on licensed diversions
- the Silver and Wallaby Creeks Environmental Entitlement 2006, which provides passing flow rules on Silver and Wallaby Creeks
- all other water in the basin not allocated for consumptive uses: this water also provides social, recreational and cultural benefits.
Environmental water use
A total of 430,418 ML of environmental water was sourced from the Goulburn basin in 2023-24. Of this, 300 ML was diverted off-stream to be delivered in-stream in the Campaspe River. The remaining 430,118 ML was delivered in-stream in the Goulburn River and Lower Broken Creek.
Management responsibilities
Management of water in the Goulburn basin is undertaken by various parties
| Authority | Management responsibilities |
|---|---|
| Coliban Water |
|
| Goulburn Broken Catchment Management Authority |
|
| Goulburn-Murray Water |
|
| Goulburn Valley Water |
|
| Grampians Wimmera Mallee Water |
|
| Melbourne Water |
|
| Water supply system | 2022-23 (ML) | 2023-24 (ML) |
|---|---|---|
| Alexandra | 527 | 556 |
| Bonnie Doon | 55 | 57 |
| Boort | 174 | 168 |
| Broadford system | 530 | 419 |
| Colbinabbin | 24 | 29 |
| Corop | 10 | 10 |
| Dingee | 5 | 11 |
| Dookie | 75 | 84 |
| Euroa system | 723 | 802 |
| Girgarre | 50 | 48 |
| Jarklin | 2 | 2 |
| Katandra West | 42 | 40 |
| Kilmore system | 1,240 | 1,264 |
| Kyabram | 1,208 | 1,320 |
| Lockington | 71 | 72 |
| Longwood | 61 | 63 |
| Macorna | 3 | 6 |
| Mansfield | 651 | 856 |
| Marysville & Buxton | 344 | 387 |
| Mitiamo | 11 | 22 |
| Mooroopna (council use) | 80 | 91 |
| Murchison | 163 | 183 |
| Mysia | 5 | 1 |
| Nagambie system | 468 | 508 |
| Pyalong | 71 | 23 |
| Pyramid Hill | 104 | 109 |
| Quambatook | 91 | 85 |
| Rochester | 281 | 433 |
| Rushworth | 235 | 262 |
| Serpentine | 45 | 60 |
| Seymour system | 1,405 | 1,596 |
| Shepparton system | 11,860 | 12,479 |
| Stanhope | 100 | 109 |
| Tatura | 1,830 | 1,952 |
| Tongala | 534 | 689 |
| Upper Delatite system | 107 | 87 |
| Woods Point | 9 | 10 |
| Yea system | 257 | 259 |
| Water supply system | 2022-23 (ML) | 2023-24 (ML) |
|---|---|---|
| Central Goulburn Irrigation Area | 227,785 | 309,403 |
| Loddon Valley Irrigation Area | 122,977 | 187,625 |
| Rochester Irrigation Area | 114,970 | 148,161 |
| Shepparton Irrigation Area | 134,006 | 183,571 |