About the area
- East Gippsland Water’s service area spans 21,000 km2. It extends from Lindenow in the west through to Mallacoota in the east and north to Dinner Plain in the Victorian Alps.
- Key population centres include Bairnsdale and the holiday centres of Paynesville and Lakes Entrance.
- Water services are provided to roughly 25,400 customers via 9 separate water supply systems.
- More information on the water corporation can be found at East Gippsland .
2021-22 overview
Urban deliveries
4,286 ML of urban residential and non-residential deliveries were made in 2021-22, similar to the previous year (4,692 ML in 2020-21).
Wastewater recycled at treatment plants
82% of wastewater was recycled (3,139 ML of 3,808 ML).
Water deliveries
Urban systems
East Gippsland Water operates 9 urban water supply systems, including 7 sourced from surface water, one from groundwater and one from both. Water is sourced from the East , , , and basins.
Table 1: Urban system water balance, East Gippsland Water
Area / town / system | Start volume in store (ML) | Total inflows (ML) | Outflows (ML) | End volume in store (ML) | Distribution system efficiency (%) | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Urban residential deliveries | Urban non-residential deliveries | Evaporation | Passed to other systems | System losses | Unattributed outflows | Total outflows | |||||
Bemm River | 5 | 13 | 6 | 5 | 0 | 0 | 0 | 0 | 11 | 6 | 100% |
Buchan | 0 | 15 | 8 | 6 | 0 | 0 | 2 | 0 | 16 | 0 | 88% |
Cann River | 3 | 25 | 13 | 10 | 0 | 0 | 2 | 0 | 25 | 3 | 92% |
Dinner Plain | 0 | 67 | 23 | 13 | 0 | 0 | 31 | 0 | 67 | 0 | 54% |
Mallacoota | 49 | 167 | 87 | 44 | 33 | 0 | 19 | 0 | 183 | 34 | 72% |
Mitchell System 1 | 1,413 | 4,220 | 2,441 | 1,079 | 178 | 22 | 381 | 0 | 4,101 | 1,533 | 86% |
Omeo | 10 | 44 | 20 | 20 | 0 | 0 | 4 | 0 | 44 | 11 | 91% |
Orbost System | 49 | 606 | 212 | 283 | 9 | 0 | 97 | 0 | 601 | 53 | 82% |
Swifts Creek | 3 | 16 | 9 | 7 | 0 | 0 | 0 | 0 | 16 | 4 | 100% |
Total 2021-22 | 1,532 | 5,173 | 2,819 | 1,467 | 220 | 22 | 536 | 0 | 5,064 | 1,644 | |
Total 2020-21 | 1,606 | 5,602 | 3,177 | 1,515 | 247 | 63 | 673 | 0 | 5,675 | 1,532 |
Recycled water
Water recycled at wastewater treatment plants can be used to supplement water available in river basins. Table 2 below lists the wastewater treatment plants managed by East Gippsland Water. Water discharged to the environment from treatment plants is included as an inflow to the water balance for each of the river basins.
The Essential Services Commission made some changes to recycled water data categories in 2021-22, so we have not included a comparison to 2020-21 in the table below. Click here to download the data for . More information can be found in How we account for water .
Table 2: Treated wastewater produced and recycled, East Gippsland Water
Wastewater treatment plant | Class of water | Inflows to plant (ML) | Recycled water end use (ML) | Total water recycled (ML) | Discharge (ML) | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Volume treated wastewater produced | Other inflow | Volume supplied to retailers | Domestic / residential | Municipal | Commercial | Industrial | Agriculture | Beneficial allocation | Within process | Total volume recycled | Total % recycled | Released to land | Ocean outfall discharge | Inland water discharge | Other outflow | ||
Bairnsdale treatment plant 1 | C | 1,480 | 106 | 0 | 0 | 0 | 17 | 0 | 0 | 1,508 | 0 | 1,524 | 96% | 0 | 0 | 62 | |
Bemm River treatment plant | C | 10 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0% | 8 | 0 | 0 | 1 |
Cann River treatment plant 2 | C | 21 | 14 | 0 | 0 | 0 | 0 | 0 | 13 | 0 | 0 | 13 | 37% | 0 | 0 | 22 | |
Dinner Plain treatment plant 3 | C | 40 | 31 | 0 | 0 | 0 | 0 | 0 | 71 | 0 | 0 | 71 | 100% | 0 | 0 | 0 | |
Lakes Entrance treatment plant 4 | C | 1,017 | 464 | 0 | 0 | 0 | 12 | 0 | 766 | 0 | 0 | 778 | 53% | 0 | 0 | 703 | |
Lindenow treatment plant 5 | B | 25 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 13 | 0 | 13 | 54% | 0 | 0 | 0 | 11 |
Mallacoota treatment plant 6 | C | 156 | 0 | 0 | 0 | 0 | 3 | 0 | 85 | 0 | 0 | 88 | 57% | 0 | 0 | 0 | 68 |
Metung treatment plant 7 | C | 99 | 155 | 0 | 0 | 0 | 0 | 0 | 168 | 0 | 0 | 168 | 66% | 0 | 0 | 86 | |
Omeo treatment plant 8 | C | 39 | 0 | 0 | 0 | 0 | 0 | 0 | 20 | 0 | 0 | 20 | 51% | 0 | 0 | 12 | 7 |
Orbost treatment plant | C | 326 | 0 | 0 | 0 | 0 | 0 | 0 | 326 | 0 | 0 | 326 | 100% | 0 | 0 | 0 | |
Paynesville treatment plant | C | 595 | 0 | 0 | 0 | 0 | 0 | 0 | 138 | 0 | 0 | 138 | 23% | 0 | 0 | 363 | 93 |
Total 2021-22 | 3,808 | 770 | 0 | 0 | 0 | 32 | 0 | 1,587 | 1,521 | 0 | 3,139 | 82% | 8 | 0 | 1,248 | 180 |