DEECA
Groundwater Management Unit

Barnawartha GMA

In this area

Surface water basin: Ovens

Water corporation: Goulburn-Murray Water, North East Water

Groundwater catchment: Ovens

About the area

The Barnawartha groundwater management area (GMA) is a small region in the lower reaches of the Indigo Creek catchment.

The major rural township within the GMA's boundary is Barnawartha.

The water authority responsible for managing groundwater in the Barnawartha GMA is Goulburn-Murray Water.

More information on the GMA can be found on the Goulburn-Murray Water website.External Link

Table 1: Groundwater level trends, Barnawartha GMA

Response to water availability

Groundwater restrictions

There were no restrictions on licensed use for the Barnawartha GMA in 2024-25.

Entitlements and use

Groundwater entitlements have been issued for licensed (non-urban) use and urban supply to Barnawartha in the Barnawartha GMA. Groundwater is also available for domestic and stock use.

Entitlement volumes

Table 2: Groundwater entitlements at 30 June, Barnawartha GMA

Available water and take

The table below shows the total water available and taken under entitlements, and estimated domestic and stock use in 2024-25. Total water available under entitlements is calculated as the sum of: opening carryover from the prior year (where available), allocation issued during the reporting year, and the net trade in or out of water, across all entitlements. The level of allocation issued is reduced if there are any restrictions in place.

Estimated domestic and stock use is calculated based on an assumed usage per registered bore per year. In this GMA, the assumed usage is 2 ML per bore per year.

More information on groundwater use and availability has been detailed in How we account for groundwater.External Link

Table 3: Groundwater availability and take, Barnawartha GMA

Compliance

Compliance against water entitlements is reported for this groundwater management unit (GMU) in 2 areas:

  • entitlement issued: that the volume of entitlements issued in the GMU does not exceed relevant permissible consumptive volumes (PCVs) or has not increased without appropriate approvals
  • water extracted: that the volume of water taken under entitlements during the year does not exceed the total water available to licence holders.

Key points on compliance against entitlements in 2024-25

Entitlement volume did not exceed the PCV

The volume of entitlements (375 ML) in the Barnawartha GMA did not exceed the PCV (2,100 ML).

Total volume extracted under licences was within the available volume

The total volume extracted under licences (10 ML) was within the volume available for the year (375 ML).

Table 4: PCV vs total entitlement volumes, Barnawartha GMA

Management responsibilities

Management of water in the Barnawartha GMA is undertaken by Goulburn-Murray Water.

AuthorityManagement responsibilities
Goulburn-Murray Water
  • Managing groundwater resources.
  • Developing and implementing groundwater management plans.
  • Issuing licences for groundwater use and bore construction.
  • Administering water for domestic and stock use.